Electrical advice · Updated 14 November 2026

Do landlords in Greater Manchester need an EICR?

What Greater Manchester landlords need to know about inspection intervals, tenant copies, unsatisfactory reports and local licensing.

View landlord EICRs

Yes, most rented homes need regular electrical inspection

For most private and social rented homes in England, landlords must make sure the electrical installation is inspected and tested by a qualified person at least every five years. The rule applies across Greater Manchester just as it does elsewhere in England. It is not limited to older houses, HMOs or properties where a tenant has reported a fault. A newer installation still needs inspection at the required interval.

The report produced is commonly called an Electrical Installation Condition Report or EICR. It records the condition of the fixed wiring and equipment forming part of the installation, with observations and a recommended next-inspection date. Some tenancy and property arrangements are excluded or treated differently, so landlords with lodgers, unusual leases or specialised accommodation should check the official guidance for their exact situation rather than relying on a general article.

Book a landlord EICR in Greater Manchester

Every five years does not always mean waiting five years

The five-year rule is a maximum interval under the regulations, not permission to ignore an earlier recommendation. If the current report says the next inspection must happen sooner, that earlier date should be followed. A change of tenancy does not automatically reset the interval, and buying a rented property does not mean the new owner can assume another five years from the purchase date.

Landlords should check the report date, the recommended next inspection and any limitations or outstanding investigation. Where a report is missing or its scope is unclear, arrange appropriate advice rather than guessing. Keeping a simple reminder for each property helps avoid an expired report, particularly when managing several tenancies across different Greater Manchester councils.

Who can carry out the landlord inspection?

The regulations require inspection and testing by a qualified person. Government guidance describes this in terms of competence and relevant experience, not simply someone who can change a socket or issue a document. The inspector should understand the installation being tested and the inspection and testing procedures required. Landlords can ask about qualifications, experience and professional-registration details before appointing someone.

An EICR should record the inspection actually completed, including any limitations. It should not be treated as a paperwork exercise to satisfy a letting agent or council. If parts of the installation could not be accessed or tested, those limitations need to be visible so the landlord can decide what further action is necessary. Plug-in appliance testing is a separate subject from the fixed-installation EICR.

When tenants and the council must receive the report

Government guidance sets specific deadlines for supplying copies. Existing tenants must receive a copy within 28 days of the inspection and test. A new tenant should receive a copy before occupying the property, and a prospective tenant who asks should receive one within 28 days of the request. The local housing authority can also require a copy and must receive it within seven days of the request.

Good record keeping makes these duties easier to meet. Store the full report rather than only a summary or invoice, and retain evidence showing when it was sent. Where the local authority requires remedial-work confirmation, the relevant written evidence must also be supplied within the required period. Landlords should consult the current government guidance for the complete rules and any changes.

What happens if the EICR is unsatisfactory?

If the report requires remedial work or further investigation, landlords must ensure that work is completed within 28 days, or within the shorter period specified in the report. C1, C2 and FI observations have particular significance, and an installation with those observations is generally reported as unsatisfactory. C3 records a recommended improvement and should be understood separately rather than presented as an urgent danger code.

After the work, the landlord needs written confirmation from a qualified person that the required remedial work or further investigation has been completed. The relevant confirmation must then be provided to tenants and, where applicable, the local authority within the prescribed timescale. Keep the original report, itemised remedial quotation, completion confirmation and delivery records together as one compliance trail.

Arrange remedial work from an EICR report

EICRs and Greater Manchester landlord licensing are different

An EICR is not an HMO licence, a selective licence or proof that every housing duty has been met. Mandatory HMO licensing applies nationally to qualifying larger shared properties. Individual councils may also operate additional or selective licensing schemes in designated areas, with their own document requirements and deadlines. A satisfactory electrical report can be one document within that wider application.

For example, Manchester and Salford publish address-specific selective licensing information, while other boroughs have different arrangements. Landlords should check the exact property address with its local council rather than assuming a postcode-wide rule. Planning permission, building regulations and HMO management duties are also separate questions. Our area guides provide starting points and official council links, but the council remains the authority for a licensing decision.

Check local Greater Manchester area and licensing guides

A practical compliance checklist for landlords

Start with the property's current EICR and check its inspection date, outcome, next-inspection recommendation and limitations. Diarise the next due date with enough time to arrange tenant access. Confirm that the inspector is competent for the work and that the price includes a full report. Tell tenants in advance that circuits may need isolating and arrange access to boards, rooms and any outbuildings in the agreed scope.

After the visit, read the observations rather than filing the report unopened. Arrange required remedial work or further investigation promptly and obtain written confirmation. Send documents to the people entitled to them within the relevant deadlines and keep proof. Finally, check whether the council requires a separate property licence. This process turns an EICR from a five-year scramble into a manageable part of routine property maintenance.

See current landlord EICR prices and book

Need landlord EICRs?

Tell us about the job. Our electricians will take care of it and confirm with you.

Book now