How much does an EICR cost in 2026?
A practical guide to EICR prices, inspection scope, report codes and the remedial costs that sit outside the inspection fee.
View EICR inspectionsCurrent BookASparky domestic EICR prices
Loaded from the same live pricing table used by the booking form.
| Property size | Inspection price |
|---|---|
| Studio | £119 |
| 1 bedroom | £129 |
| 2 bedrooms | £149 |
| 3 bedrooms | £169 |
| 4 bedrooms | £199 |
| 5 bedrooms | £229 |
HMOs, multiple consumer units and more complex properties may need a separate quotation. Any extra charges should be agreed before the visit.
The short answer on EICR prices
In 2026, there is no single sensible EICR price for every property. A studio with one small consumer unit normally takes less time to inspect than a large house with several distribution boards, an annex and outdoor circuits. The most useful quote therefore starts with the property type, number of bedrooms and number of boards, not just the postcode. BookASparky shows current fixed prices for defined domestic property sizes in the live table below.
The inspection fee pays for the electrician's time, testing and report. It does not automatically include repairs to defects found during the visit. This distinction matters when comparing quotes: a cheaper inspection may have a narrower scope, while a very low headline figure may not include the time needed to test every circuit properly. Ask what will be inspected, how limitations are recorded and whether the report is included before comparing prices alone.
What an EICR inspection should cover
An Electrical Installation Condition Report assesses the fixed electrical installation rather than every plug-in appliance. The electrician visually inspects accessible parts and carries out appropriate electrical tests on circuits, protective devices, earthing and bonding. Sockets, switches, fixed fittings and the consumer unit form part of the installation, although not every accessory can necessarily be dismantled or every concealed cable seen.
The completed report should identify the installation, describe the extent and limitations of the inspection, and record observations using recognised classification codes. It should also state the date of the inspection and when the next inspection is recommended. An EICR is a snapshot of condition at that time; it is not a guarantee that a hidden fault can never develop afterwards. Clear access to the consumer unit and rooms helps reduce unavoidable limitations.
Factors that can increase or reduce the cost
Property size is a useful starting point because more rooms often mean more circuits and accessories. The actual number of circuits is usually more important than the bedroom count alone. A small flat with an electric shower, several heaters and a separate landlord supply can take longer than a straightforward larger home. Multiple consumer units, outbuildings and communal areas also add work and should be declared when requesting a price.
Age alone does not determine the fee, but older or heavily altered installations can require more time to identify circuits and investigate unexpected readings. Access is another factor. Locked meter cupboards, blocked consumer units, fragile finishes or tenants who cannot provide room access may limit testing. Commercial premises, HMOs and unusual buildings often need an individually agreed scope rather than a standard bedroom-based price.
- Number of circuits and consumer or distribution units
- Property layout, including garages, annexes and outdoor supplies
- Access to rooms, meters, boards and fixed equipment
- Previous alterations and the quality of available circuit records
- Whether the property is domestic, an HMO or commercial premises
Does the price include remedial work?
Normally, the EICR price covers inspection, testing and production of the report, not the cost of correcting observations. If the report identifies a C1 danger-present issue, a C2 potentially dangerous issue or FI further investigation, the electrician should explain what happens next. Immediate action may be needed to make an installation safe, while other work can be quoted and scheduled separately.
C3 means improvement is recommended; it does not carry the same meaning as C1 or C2. For rented property, an unsatisfactory report can create specific duties and timescales for the landlord. Ask for remedial work to be itemised so you can see which observations are being addressed. You can also provide an existing report when booking remedial work, although further investigation may be needed where the defect or its location is unclear.
How long an EICR takes and how to prepare
A small flat or house may take a few hours, but larger properties and complex installations take longer. Testing commonly involves switching power off for periods, so occupants should plan around work, cooking, medical equipment and internet access. The electrician should explain isolation before it happens. Nobody should attempt to remove a consumer-unit cover or expose live parts to make the visit quicker.
Before the appointment, clear safe access to the consumer unit, meters and accessories where possible. Make sure someone can provide entry to every relevant room and any garage or outbuilding included in the scope. Gather previous reports and details of alterations if you have them. These records can help the electrician understand the installation, but they do not replace current inspection and testing.
Choosing an EICR on value rather than headline price
A useful EICR should give you a clear, usable record of the installation, not simply a certificate with a satisfactory box ticked. Before booking, confirm who will carry out the work, what inspection and testing competence is relevant, and how you will receive the report. If you are a landlord, the person performing the inspection must be qualified and competent for that work.
For a straightforward Greater Manchester home, use the current price table and service page to choose the correct property size. For an HMO, multiple boards or commercial premises, request a quotation that describes the full scope. This gives you a more meaningful comparison and reduces the chance of unexpected additions on the day. Any remedial work should then be agreed separately before it starts.